Loading... Please wait

Current Projects

AREA - 1
(10-17 CENTERDALE)      
Effective dates: 08/28/2017 - 12/31/2018
CLEANING & LINING, LSRS
Streets Effected by contract. (May be entire street or portion.)
BYRON ST, EAST AVE, FENWAY ST, FERNCLIFF AVE, GEORGE ST, HALSEY ST, LINCOLN ST, REDFERN ST, PEACH HILL AVE
 
AREA - 1
(10-17 CENTERDALE)      
Effective dates: 08/28/2017 - 12/31/2018
CLEANING & LINING, LSRS
Streets Effected by contract. (May be entire street or portion.)
BYRON ST, EAST AVE, FENWAY ST, FERNCLIFF AVE, GEORGE ST, HALSEY ST, LINCOLN ST, REDFERN ST, PEACH HILL AVE
 
AREA - JOHNSTON
(12-17 GREENVILLE AVE)      
Effective dates: 09/18/2017 - 12/31/2017
INSTALLING 12" DI AND ABANDONING PARALLEL 8" DI
Streets Effected by contract. (May be entire street or portion.)
COLWELL DR, GREENVILLE AVE, SPRING ST
 
AREA - JOHNSTON
(12-17 GREENVILLE AVE)      
Effective dates: 09/18/2017 - 12/31/2017
INSTALLING 12" DI AND ABANDONING PARALLEL 8" DI
Streets Effected by contract. (May be entire street or portion.)
COLWELL DR, GREENVILLE AVE, SPRING ST
 
EDGEWOOD AREA - CRANSTON
(2016-01)      
Effective dates: TBD - TBD
WATER MAIN REPLACEMENT
Streets Effected by contract. (May be entire street or portion.)
BROAD ST TO NARAGANSETT BLVD NORWOOD AVE TO SHAW AVE
 
AREA - PROVIDENCE
(2018-1)      
Effective dates: TBD - TBD
CLEANING AND RELINING STREETS IN THE FOX POINT NEIGHBORHOOD OF PROVIDENCE
Streets Effected by contract. (May be entire street or portion.)
GEORGE ST, BENEVOLENT ST, PLANET ST, BROWN ST, THAYER ST, CHARLESFIELD ST, BROOK ST, POWER ST, HOPE ST, YOUNG ORCHARD AVE, GOVERNOR ST
 
AREA - PROVIDENCE
(2018-1)      
Effective dates: TBD - TBD
CLEANING AND RELINING STREETS IN THE FOX POINT NEIGHBORHOOD OF PROVIDENCE
Streets Effected by contract. (May be entire street or portion.)
GEORGE ST, BENEVOLENT ST, PLANET ST, BROWN ST, THAYER ST, CHARLESFIELD ST, BROOK ST, POWER ST, HOPE ST, YOUNG ORCHARD AVE, GOVERNOR ST
 
AREA - 1
(2018-2)      
Effective dates: TBD - TBD
CLEANING & RELINING STREETS IN THE MARIEVILLE AREA OF NORTH PROVIDENCE.
Streets Effected by contract. (May be entire street or portion.)
BASSETT ST, REMINGTON RD, COOPER ST, CHARLES ST, FRANKLIN ST, ADAM ST, CLEVELAND ST, LOJAI BLVD, GARFIELD ST, WARD AVE, ANDERTON AVE, BAIRD AVE, CAMPBELL AVE, DICKINSON AVE, DORMAN AVE, ATWOOD AVE
 
AREA - 1
(2018-2)      
Effective dates: TBD - TBD
CLEANING & RELINING STREETS IN THE MARIEVILLE AREA OF NORTH PROVIDENCE.
Streets Effected by contract. (May be entire street or portion.)
BASSETT ST, REMINGTON RD, COOPER ST, CHARLES ST, FRANKLIN ST, ADAM ST, CLEVELAND ST, LOJAI BLVD, GARFIELD ST, WARD AVE, ANDERTON AVE, BAIRD AVE, CAMPBELL AVE, DICKINSON AVE, DORMAN AVE, ATWOOD AVE
 
GREENVILLE AVE AREA - JOHNSTON
(CITIZENS BANK CAMPUS)      
Effective dates: 04/03/2017 - TBD
WATER MAIN INSTALLATION ON GREENVILLE AVE. AND NEW STREET. UPGRADES TO GREENVILLE AVE PUMP STATION AND STORAGE TANK
Streets Effected by contract. (May be entire street or portion.)
GREENVILLE AVE, CITIZENS BANK WAY
 
FOX POINT AREA - PROVIDENCE
(CONTRACT 1-17)      
Effective dates: TBD - TBD
FOX POINT AREA MAIN REHABILITATION
Streets Effected by contract. (May be entire street or portion.)
ARNOLD ST, BROOK ST, DOVE ST, EAST ST, GOULDING ST, HOPE ST, JAMES ST, JOHN ST, THAYER ST, TRANSIT ST. WICKENDEN ST, WILLIAMS ST
 
EDGEWOOD AREA - CRANSTON
(CONTRACT 2-17)      
Effective dates: TBD - TBD
EDGEWOOD AREA MAIN REHABILITATION
Streets Effected by contract. (May be entire street or portion.)
ASHMONT ST, BARTLETT AVE, BEACHMONT AVE, BETSY WILLIAMS DR, BROAD ST, CLIFFDEN AVE, DUNHAM AVE, EDGE ST, EDGEWOOD BLVD, EDGEWOOD AVE, FC GREENE MEM BLVD, FERNCREST AVE, HADDEN HILL RD, HENRY ST, HIGH ST, INGESIDE AVE, IVY AVE, NORWOOD AVE, PARK AVE, RHODES AVE, TAFT ST, VILLA AVE, WARWICK AVE, WENTWORTH AVE, WESTWOOD AVE, WESTERN PROMENADE, WHEELER AVE
 
EDGEWOOD AREA - CRANSTON
(CONTRACT 2015-1)      
Effective dates: 03/01/2015 - TBD
THE WORK SHALL CONSIST OF THE CLEANING AND CEMENT LINING OF APPROXIMATELY 19,500 L.F. OF EXISTING 6", 8" AND 12" CAST-IRON WATER MAINS; AND THE REMOVAL AND REPLACEMENT OF APPURTENANCES (VALVES, HYDRANTS AND SERVICES), INCLUDING THE REPLACEMENT OF EXISTING LEAD WATER SERVICE LINES WITH NEW COPPER WATER SERVICE LINES AND APPURTENANCES WITHIN PUBLIC SPACE, AND THE ASSOCIATED PERMANENT RESTORATION OF STREETS, SIDEWALKS, AND GRASSY AREAS, WITHIN THE CRANSTON-EDGEWOOD SERVICE AREA OF THE PROVIDENCE WATER SUPPLY BOARD’S DISTRIBUTION SYSTEM.
Streets Effected by contract. (May be entire street or portion.)
WARWICK AVE, BROAD ST, PARK AVE, FERNCREST AVE, MOORLAND AVE, BOWEN ST, MALVERN AVE, SYLVAN AVE, HARDING AVE, RIVER ST, BOW ST, MILTON AVE, WILLIAMS AVE, ALHAMBRA CIR, DOYLESTON DR, KNEELAND ST, TUCKER AVE, PARKWAY AVE, COMMERCIAL ST, SHELDON ST, GEORGE ST, SPRINGWOOD ST, AND ABORN ST
 
BLACKSTONE AREA - PROVIDENCE
(CONTRACT 2015-2)      
Effective dates: 03/01/2015 - TBD
THE WORK SHALL CONSIST OF THE CLEANING AND CEMENT LINING OF APPROXIMATELY 46,250 L.F. OF EXISTING 6", 8" AND 12" CAST-IRON WATER MAINS; AND THE REMOVAL AND REPLACEMENT OF APPURTENANCES (VALVES, HYDRANTS AND SERVICES), INCLUDING THE REPLACEMENT OF EXISTING LEAD WATER SERVICE LINES WITH NEW COPPER WATER SERVICE LINES AND APPURTENANCES WITHIN PUBLIC SPACE, AND THE ASSOCIATED PERMANENT RESTORATION OF STREETS, SIDEWALKS, AND GRASSY AREAS, WITHIN THE PROVIDENCE WAYLAND AND BLACKSTONE SERVICE AREAS OF THE PROVIDENCE WATER SUPPLY BOARD’S DISTRIBUTION SYSTEM.
Streets Effected by contract. (May be entire street or portion.)
ANGELL ST, GANO ST, BLACKSTONE BLVD, BUTLER AVE, STIMPSON AVE, DIMAN PL, VILLA AVE, ARLINGTON AVE, HUMBOLDT AVE, ADELPHI AVE, ELMGROVE AVE, ORCHARD AVE, UNIVERSITY AVE, IRVING AVE, ELTON ST, COLE AVE, SLATER AVE, TABER ST, WAYLAND AVE, IVES ST, WATERMAN ST, INDIA ST, PRESIDENT AVE, LLOYD AVE, LORRAINE AVE, EDISON AVE, HOBART AVE, MILES AVE, AND KINGSTON AVE
 
FOX POINT SOUTH AREA - PROVIDENCE
(CONTRACT 2016-11)      
Effective dates: TBD - TBD
PRIMARILY CLEANING AND LINING CAST IRON WATER MAIN IN THE FOX POINT AREA OF PROVIDENCE.
Streets Effected by contract. (May be entire street or portion.)
BROOK ST ARMSTRONG AVE. THOMPSON ST. ANN ST. GEORGE M. COHAN BLVD. HOPE ST. EAST ST. ALVES WY.
 
VARIOUS AREA - VARIES
(MISC PWSB PROJECTS)      
Effective dates: TBD - TBD
MISCELLANEOUS PWSB PROJECTS
Streets Effected by contract. (May be entire street or portion.)
VARIES